Panel installation and wiring

Solar, Battery and EV Charger: What a Complete UK Install Looks Like

Spirit Energy, a family-run solar and battery installer from Reading, Berkshire, documented a complete Hampshire installation from survey to handover, with Gary Does Solar reviewing the work. The job combined 20 solar panels, a Tesla Powerwall 3 and a zappi EV charger. This guide walks through what happens at each stage and what to look for when comparing UK installers.

Video: "Installing Solar Panels & Tesla Powerwall 3 with GARY DOES SOLAR" by Spirit Energy, a UK solar and battery installer based in Reading, Berkshire.

MCS installation and DNO notification required. Solar panels, battery storage and EV charger installations that connect to the mains grid are MCS-notifiable. Only an MCS-registered installer can certify the system for Smart Export Guarantee eligibility. If the system includes battery export, the DNO must be notified under G99 before the system is energised. Working inside the consumer unit or on DC strings always requires a qualified electrician.

1. Getting the design right before installation day

The difference between a quote that runs smoothly and one that creates problems later often comes down to how thorough the initial design is. Spirit Energy prepared a full system design before the Hampshire homeowner made a decision: a shading assessment of the roof, a string layout matched to the inverter's input specifications, battery sizing against the household's actual usage data, and a check of the existing consumer unit.

Gary Does Solar compared several quotes on the homeowner's behalf and selected Spirit Energy based on the detail in the design rather than on price alone. A quote with a panel count and a total figure but no string design or shading analysis should prompt questions.

Key things to ask any installer before signing:

2. What installation day involves

The Hampshire install was a two-day job, which is typical for a combined solar, battery and EV charger project of this scale.

Day one focused on the roof: scaffolding went up early morning, then the team fitted the mounting rails and hooks, sealed every roof penetration, ran the DC cabling from the roof to the planned inverter location inside, and clipped the 20 solar panels into the rail system. The DC strings were left disconnected until the inverter was ready.

Day two covered the electrical side. The inverter was mounted and connected to the DC strings from the roof. The Tesla Powerwall 3 was fixed to the wall and wired to the inverter's battery port. Consumer unit connections were made for the generation and export meters. The zappi EV charger was wired from the consumer unit to the driveway charging point. Once all connections were checked, the system was powered up and commissioned.

3. The Tesla Powerwall 3 as the battery choice

The Tesla Powerwall 3 is a wall-mounted battery system with 13.5 kWh of usable storage and an integrated inverter. Unlike many DC-coupled battery systems, the Powerwall 3's integrated inverter means it connects to the AC side of your existing solar system rather than requiring a separate hybrid inverter, which simplifies the installation in some configurations.

Spirit Energy were among the first UK installers to work with the Powerwall 3. For the homeowner, the key practical features were whole-home backup capability (the system can power the house during a grid outage), time-based charging (charging from the grid at off-peak rates overnight), and the Tesla app for monitoring generation, consumption and battery state of charge.

Battery storage connected to a grid-tied solar system for export is MCS-notifiable work, and the system requires G99 DNO notification before energising if it exports. Spirit Energy handled the notification as part of the installation.

4. Adding the zappi EV charger

The zappi is a solar-diverting EV charger made by myenergi. Its key feature is an eco mode that monitors the solar generation and charges your car from surplus generation rather than drawing from the grid. If your solar output drops, the charger reduces the charge rate to match what is available rather than topping up from the grid automatically.

Installing the zappi at the same time as the solar and battery meant the cabling from the consumer unit to the driveway charging point was included in the same scaffolding and cable route planning as the rest of the job. The myenergi hub connects the zappi to the inverter's monitoring signal so eco mode can respond accurately to actual solar surplus.

An EV charger installation also qualifies for the OZEV-funded EV chargepoint grant for homeowners (up to £350 off the installation cost at the time of writing), which is worth checking with your installer when planning the combined project.

5. What Gary Does Solar looked for in the final inspection

Once the system was commissioned, Gary Does Solar reviewed the completed installation. The checks are broadly what any homeowner or independent assessor would want to see:

The installation passed on all counts. The homeowner reported that Gary's recommendation to choose Spirit Energy based on the thoroughness of the design was borne out by the quality of the finished job.

Frequently Asked Questions

How long does a solar, battery and EV charger installation take?

A combined solar, battery and EV charger installation typically takes two days. Day one covers scaffolding and roof work: mounting rails, DC cabling and panels. Day two covers the electrical connections: inverter, battery, consumer unit work and EV charger wiring. Commissioning and DNO notification follow on the same day or shortly after, depending on the complexity of the system.

Can I add an EV charger at the same time as solar and battery?

Yes, and it often makes sense to plan all three together. A combined quote lets the installer design the consumer unit connections, cable routes and monitoring as a single system. A solar-diverting charger such as the zappi integrates directly with your solar monitoring to charge your car from surplus generation rather than from the grid. Adding a charger later is possible but can cost more if new cable routes are needed.

Does a Tesla Powerwall 3 need a separate MCS certificate?

Battery storage connected to your solar array for grid export is MCS-notifiable work. Your installer issues an MCS Microgeneration Installation Standard certificate covering the whole system: panels, inverter and battery. This certificate is required for Smart Export Guarantee registration and to confirm the installation meets UK standards. If the system includes battery export capability (G99 rather than G98), the DNO must be notified before the system is energised.

Get a combined solar, battery and EV charger quote See MCS installations