Panel installation and wiring
Red Flags of a Bad Solar Install: Lessons from a UK Farm Inspection
A UK farmer paid £65,000 of a £100,000 solar and battery quote, waited eight months, and was left with sagging panels, tangled wiring, and an inverter that did not match his array. When Artisan Electrics inspected the site, the problems they found are ones that could have been caught on the day the installation was complete, before the farmer signed anything off.
Video reference. Artisan Electrics, a UK solar and battery specialist firm, documented this farm inspection on their YouTube channel in November 2026. The video walks through each fault they found and explains what a correctly installed system should look like at sign-off.
Who this applies to
The faults in this case were on a large commercial and agricultural system over 50 kWp, well beyond the typical domestic install. But the same principles apply to any size: panel mounting, cable management, inverter sizing and proper commissioning are relevant whether your array is 10 panels or 200. If you are considering a residential MCS installation, the checks in this guide are still worth asking your installer about at sign-off.
1. Walk the array before you sign off
The most basic check is also the one that caught the first problem in this case: look at the panels from the ground. A properly mounted array should sit flat on its rails with every panel at the same height, all gaps between modules consistent, and the rows straight. Sagging or uneven panels mean the mounting has either been installed incorrectly or not been tightened properly. In the farm case, the original installer had already attempted to correct the problem three times and still had not resolved it.
If you are on a single-storey roof or can safely access the array from a scaffold, check that the clamps are all present and that none of the panels rocks or flexes when you press gently on the frame. Any movement means the fixings are not done up.
2. Check the cable routing and labelling
DC cables between the array and the inverter should be clipped neatly to the underside of the mounting rails or run in UV-stable conduit, with no loose loops or runs resting on the roof surface. In the farm inspection, the cabling was described as a "rat's nest": multiple cables crossing each other with no clipping and no labels. That condition means fault-finding is dangerous (you cannot tell which cable belongs to which string without energising them) and the cables are at greater risk of physical damage from wind movement over time.
Every cable or string should be labelled at both the array end and the inverter end. If the labels are missing, ask the installer to fit them before you accept the work.
3. Ask for the commissioning data
Before you make your final payment, ask for the commissioning report. This is the document that records the measured open-circuit voltage and short-circuit current for each string, taken on the day the system was tested. Those figures confirm that each string was correctly wired and that its output matches what was designed. Without this document, there is no written evidence that the electrical work was verified rather than just assumed to be correct.
An MCS-registered installer is required to issue this documentation as part of the certification process. If your installer cannot produce it, the installation is not complete.
4. Confirm end clamps are fitted
End clamps are the fixings that hold the first and last panel in each row to the mounting rail. Mid clamps sit between two adjacent panels and are held in place by the panels on either side; end clamps are the only thing holding the outer panels from sliding off the rail in wind. Missing end clamps are one of the simpler faults to spot visually, and also one that can result in panels coming loose in a storm. Walk to the end of each row and confirm the clamps are present and tight.
5. Verify inverter sizing in writing
In the farm case, the inverter was mismatched to the array, which required changes to the electrical arrangement before the system could be properly commissioned. Inverter sizing is a design decision made before installation begins, so by the time you are walking around a finished system, it is too late to change it easily. The right time to check is during the design sign-off, not at commissioning.
Ask your installer for a written string design before work starts. It should show the number of panels per string, the string voltage and current, and confirmation that the inverter's DC input specifications are within range for the array as designed. If you are adding battery storage, confirm that the battery and hybrid inverter combination is also correctly specified together.
What to do if you spot problems at sign-off
Do not make your final payment until defects are corrected and you have the commissioning documentation in hand. If the installer has gone out of business, or if you are dealing with a system already on a property you have bought, an independent MCS-registered engineer can inspect the system, document the faults in writing, and advise on what remediation is needed. For systems over 50 kWp, the MCS complaints process may not apply: check with the relevant certification body before assuming it does.
Frequently Asked Questions
What is an end clamp on a solar panel installation?
An end clamp is the fixing that holds the first or last solar panel in a row to the mounting rail. Mid clamps sit between two adjacent panels and are held in place by the panels on either side; end clamps are the only thing holding the outer panels from sliding or lifting in wind. Without them, panels at the ends of rows are unsecured and can be damaged or become a safety hazard in high winds.
How do I know whether my inverter is the right size for my array?
The inverter's rated DC input power should be compared to the total peak output of your array (the sum of all panel wattages). A common rule of thumb is that the inverter should be rated at 80 to 100 percent of the array peak output for a south-facing UK installation. Your installer should be able to provide a string design document showing this calculation. If the inverter is significantly smaller than the array, it will clip generation on the best solar days.
Can I get an independent inspection before I sign off a solar installation?
Yes, and for a large system it is well worth doing. An independent MCS-registered engineer can inspect the mounting, cabling and commissioning before you make your final payment. This gives you documented evidence of any defects while the original installer is still on the hook to fix them. For agricultural or commercial systems over 50 kWp, check whether your certification body covers that scale before assuming their complaints process applies.