What Does a Good UK Solar Install Actually Look Like? Gary Does Solar Reviews a Heatable Job

Most solar videos show the sales pitch. This one shows the inspection. Gary Does Solar visited a completed Heatable MCS-certified installation in January 2026 and rated it on camera. Here is what he looked for, what he found, and what it tells you about how to judge any finished installation.

Helpful video reference. Heatable's video "Gary Does Solar Rates Our Solar Install" features Gary from Gary Does Solar, a UK solar and battery advice channel, visiting a completed Heatable installation and rating it on camera. Heatable is a UK MCS-certified solar installer and Tesla Premium Partner.

MCS-notifiable work: who must carry this out

Any solar installation connected to the mains for export must be MCS-certified and the DNO must be notified before the system is energised. Working inside the consumer unit or on incoming mains always needs a qualified, competent person. The MCS certificate is what unlocks the Smart Export Guarantee, so never accept a system without one.

1. Confirm MCS certification and documentation before anything else

The first thing to check when a solar installation is complete is the paperwork. You should receive an MCS certificate listing the system specification (panel make and model, inverter make and model, total installed capacity in kWp), an electrical installation certificate (EIC) signed by the installing electrician, and confirmation that the DNO has been notified. If your installer cannot produce these on the day, ask in writing before you sign off. Without the MCS certificate, you cannot register for the Smart Export Guarantee.

2. Walk the roof and check the physical installation

You do not need to get onto the roof yourself, but walk around the building and look up at the array from ground level. All panels should be in line, with no visible sagging or misaligned rails. If you can see the cable runs at the array edge, they should be secured and not hanging loose. Any roof penetration (for the cable down to the inverter, or for mounting bolts) should have flashing or sealant applied. A good installer will offer a brief photo record of the mounting before the panels went on; ask for it if it was not provided.

3. Check the inverter installation and cable work inside the property

The inverter should be mounted on a wall in a cool, ventilated space, not in a hot loft or directly in sunlight. The DC cables from the roof should be enclosed in conduit or trunking from where they enter the building down to the inverter. The AC connection from the inverter to the consumer unit must be carried out by a qualified electrician, and the work should be covered by the EIC. If you can see bare cables or improvised connections anywhere on this route, that is a defect.

What Gary's inspection in the Heatable video covers

  • Panel alignment and tiling: Consistent rows, no gaps, correct flashings at verge and ridge.
  • Cable management: Secured, labelled, no UV-exposed runs on the roof surface.
  • Inverter siting and labelling: Clear AC/DC isolation labels, accessible for maintenance.
  • Generation reading: Inverter displaying live output on first day.
  • Documentation: MCS certificate and EIC present before the installer left site.

4. Register for the Smart Export Guarantee straight away

Once you have your MCS certificate, choose a Smart Export Guarantee licensee, submit your application, and confirm your smart meter is set to record export. SEG rates vary by supplier and change regularly, so compare before choosing. Apply as soon as you can: each month you delay is export income you will not recover, and there is no retrospective payment for exports before your registration date.

5. Set up monitoring and check your first-week generation figures

Install the inverter's monitoring app or connect to a third-party monitoring platform on day one. Cross-check your first few days of generation against what a system of your size in your location should produce. Use a solar performance estimator for your postcode: a 4kWp array on a south-facing roof in the south of England should produce roughly 3,500 to 4,000 kWh a year. A system generating significantly less than forecast in its first weeks may have a faulty module, shading issue, or wiring problem worth investigating early.

Frequently Asked Questions

What documentation should I receive after a UK solar installation?

You should receive an MCS certificate listing the system specification, an electrical installation certificate (EIC) covering the electrical work, a Building Regulations completion certificate or notification reference if applicable, and confirmation that your DNO has been notified. Keep all of these: you need the MCS certificate to register for the Smart Export Guarantee.

What does the Smart Export Guarantee pay, and when does it start?

SEG rates vary by licensee and change frequently. Payments begin once your application is approved and your smart meter is confirmed as recording export. Apply as soon as you have your MCS certificate: each month you wait is export income you will not recover.

How do I know if my solar system is performing as expected?

Most inverters have a monitoring app that shows daily, monthly and annual generation. Cross-check your figures against a solar performance estimator for your postcode and system size. A system generating significantly less than predicted after a few weeks may have a faulty panel, shading problem, inverter issue, or wiring fault. Contact your MCS-certified installer: most defects show up in the first months of operation.

Get a free MCS installation quote See MCS installations