Why EV Charger Fires Happen and How to Avoid Them

Artisan Electrics, a Cambridge-based electrical firm, filmed a customer call-out for an EV charger that caught fire. It was an honest look at what went wrong and what proper installation prevents. Here is what every EV charger owner and prospective buyer needs to know about keeping a home charge point safe.

Video: "Customer's EV Charger CAUGHT FIRE!" by Artisan Electrics, a UK solar, battery and EV charging firm based in Cambridge.

Important: EV charger installation is notifiable work and must be done by a qualified electrician. Connecting a home charge point requires a new circuit from the consumer unit. This is Part P notifiable work under the Building Regulations in England and Wales. Only a Part P registered electrician can legally carry out and certify this work. If you want to claim the EV Infrastructure Grant, the installer must also be OZEV-registered. Working on the consumer unit or the incoming mains supply without the right qualifications is not permitted.

1. How an EV charger fire starts

A home EV charger running at 7 kW draws around 32A for the full duration of a charge session, which can easily run for four to ten hours overnight. That is a sustained electrical load that domestic wiring was not always designed to handle, and it is what makes EV charger installations different from most other household appliances.

Most charger fires trace back to one of four causes:

2. What a safe installation requires

A correctly installed home EV charger needs four things: a dedicated circuit, correctly sized cable, appropriate circuit protection, and proper earthing.

The dedicated circuit runs from a spare way in the consumer unit directly to the charge point, with no other loads connected. Cable sizing depends on the run length and installation method: for most domestic runs, 6mm2 two-core and earth is the minimum for a 32A circuit, and 10mm2 may be needed for longer routes or cables installed in thermal insulation.

Circuit protection should include an MCB rated for the charger's maximum current, and an RCD. BS 7671 requires at minimum a Type A RCD for EV charger circuits. Some charge points (particularly older single-phase models and those with internal Mode 3 control electronics) can generate small DC leakage currents: if the charger does not have built-in DC leakage protection, a Type B RCD is required at the consumer unit instead.

Earthing arrangements matter too. Where the charge point is installed outdoors or in a detached garage, additional earth bonding may be required. Your installer should assess this during the site survey.

3. Why OZEV registration and Part P certification matter

OZEV-registered installers are assessed against a standard that covers site survey requirements, cable sizing, circuit protection, earthing and Part P certification. The registration is mandatory if you want to claim the EV Infrastructure Grant (the government grant for home charger installation, currently worth up to £350 for eligible properties). But the same reasons that make OZEV registration useful for the grant are also why it is a sensible minimum quality standard regardless.

An OZEV-registered installer must carry out a site survey before quoting. That survey checks whether your existing consumer unit has a spare way, whether the main supply fuse and meter are rated for the additional load, and whether any supply capacity upgrade is needed. These are the checks that catch problems before they become a fire risk.

Part P certification means the work is notifiable to your local authority and the electrical installation certificate is recorded. This matters if you sell the property: a buyer's solicitor will ask for the certificate, and an installation without one may cause complications at sale.

4. How to check an existing installation

If your EV charger was installed some years ago, by a firm that is no longer trading, or without a certificate you can find, it is worth getting it checked. The inspection is not complicated and any Part P registered electrician can do it:

Any scorching, burning smell, or warm casing during charging is a reason to stop using the charger and have it inspected before the next charge session.

5. Choosing a charger and an installer

For the charger itself, look for products that carry CE or UKCA marking and are listed on the OZEV approved product list (or approved under the equivalent earlier scheme). Charger brands available through OZEV-registered installers have been assessed for the grant scheme, which provides some assurance about product quality. Avoid buying a charger online and asking an electrician to fit it without first confirming compatibility and warranty terms.

When choosing an installer, ask:

A good installer will not ask you to do any consumer unit work yourself or suggest adding the charger to an existing ring or radial circuit. If that is what you hear, treat it as a warning sign.

If you are pairing an EV charger with a solar installation, an MCS-registered firm that also covers EV charging can carry out both under a single visit and ensure the solar inverter, battery and charger are set up to work together from the start.

Frequently Asked Questions

What causes a home EV charger to catch fire?

Most EV charger fires result from undersized cables overheating under sustained high-current draw, loose or corroded connections generating resistive heat, or a charger sharing a circuit that was not rated for continuous 32A load. A 7 kW home charger draws around 32A for the full duration of a charge session. Regular inspection by a qualified electrician catches these problems before they develop into a fire.

Do I need a qualified electrician to install a home EV charger?

Yes. Connecting a home charge point to the consumer unit is Part P notifiable work under the Building Regulations. Only a Part P registered electrician can legally carry out and certify the installation. If you want to claim the EV Infrastructure Grant, the installer must also be OZEV-registered, which requires a site survey before the work starts and certification afterwards.

Can a standard 3-pin plug socket charge an EV safely?

Occasional top-up charging through a 3-pin socket at 10A is acceptable in an emergency. Regular overnight charging is not recommended: domestic socket outlets and their wiring were not designed for sustained high-current loads over many hours, and the connections inside a socket outlet can degrade over time, increasing fire risk. A dedicated wall-mounted charge point on a properly installed dedicated circuit is the right solution for regular home charging.